standard institute of engineering
Quantity SurveyorsA quantity surveyor (QS) is a construction industry professional with expert knowledge on construction costs and contracts.
Diploma in CIVIL-QS -Course Syllabus | Table of Contents
MODULE: I – BASIC-QS
MODULE: II – ADVANCED-QS
1. PRE – CONTRACT / TENDERING (BEFORE CONTRACT IS AWARDED)
2. POST– CONTRACT / TENDERING (AFTER CONTRACT IS AWARDED)
• Who Are “Quantity Surveyors “ Or What Is “Quantity Surveying” ?
• Construction Project & Organization Structure – Position Of Qs.
• Introduction To Basic Concepts Of Uom ( Units Of Measurements ) & Dimensions – Linear, Areal &Volumes–Rule
• What Is A Quanity Estimate – Levels & Lines – Practical Applications.
• Data Required To Prepare An Estimate.
• Difference Between Detailed Estimate & Abstract Cost Estimate – Solved Examples.
• Budget Calculations
• Time Calculations.
WHAT IS A CONTRACT?
Different Kinds Of Civil Engineering Projects / Structures
• Building Projects – Individual Houses, Apartments, Commercial Malls, Townships, Etc.,
• Road Projects – Asphalt & Concrete Pavements.
• Oil & Gas Projects
• Industrial Projects
• Irrigation Dams
• Bridges
• Culvertshow To Read The – “Engineering Drawings& Details “?
• Plans
• Elevations
• Sectionshow To Read The Pts – Project Technical Specifications Contract Specifications.
• Research & Development Facilities
• Education & Training
• Equipment Manufacture
METHODS OF TAKING OUT QUANTITIES
• Long – Wall & Short – Wall Method
• Center-Line Method
• Plinth Area Method
• Cubical Contents Methods
• Service Unit Method.
• Quantity Calculations/Take-Off’s – Structural & Architectural Items.
• Earthworks – Surveying – Excavation/ Cutting, Filling & Back-Filling Works – Roads & Buildings
• Anti-Termite, Polythene Sheet, Water-Proofing Membrane & Screed Concrete.
• Concrete Works –Foundations (Isolated, Stepped , Rafts, Piles, And Pile-Caps, Rock-Anchor, Etc., ), Retaining Walls, Dpc, Columns, Beams, Slabs , Lintels, Water Tanks, Septic Tank, Etc.,
• Shuttering & Form Works
• Steel – Preparation Of “Bbs – Bar Bending Schedules “ & Quantity Take-Off’s
• Plinth Beams, Columns, Slab Beams, Slabs, Etc.
• Brickwork Calculation– Rooms, Compound Walls, Etc.,
• Finishing Works – Tiles – Flooring & Cladding, Plaster (In And Out), Structural Glazing & Aluminium Frames, Painting, Woodworks Calculation Etc.
• Interior Decorating Works
• Basic Mep – (Mechanical, Electrical, And Plumbing) :
1. Water Supply
2. Stormwater
3. Drainage
4. Fire-Fighting
5. Electrical
6. Air-Conditioning
• How To Prepare A B.O.Q (Bill Of Quantities) & B.O.M (Bill Of Materials) – Computer Aided.
• What Is Rate Analysis & Schedule Of Rates | How To Calculate Rate – Analysis For All Construction Activities?
• Detailed Estimation, Preparation Of B.O.Q (Works)&B.O.M – Computer Aided.
1. Types Of Contracts –
2. Lumpsum Contract
3. Item Rate Contract
4. Cost-Plus Contract
5. Epc Contract
• What Is Tendering And How Tendering Process Happens –
• Pre-Bid Preparations
• Calling For Tenders
• Finalizing L1, L2 & L3 – Negotiation Techniques
• Awarding Of Contract – Kick-Off Meeting
• Roles & Responsibilities Of Estimator &Quantity Surveyor
• Material Procurement – Purchase Orders & Work Orders – Receipt At Stores.
• Weekly / Monthly Bill Preparation & Retentionpercentage
• Sub-Contracting – Quotations & Invoice Clearing
• Work Order Preparation Steps.
• What Is Cash Flow?
• Weekly Cash Flow
• Monthly Cash Flow
• M-Book & Recording Measurements.
• Co-Ordination With Qa/Qc For Signed Inspection Requests.
• Bill Preparation, How To Check The Bills, Bill Certifications & How To Close A Bill
• Role Of Quantity Surveyor In Post Construction Works.
• Make Variation Orders – Recording Of Works.
• Documentation Back-Ups ( Soft Copies & Hard Copies )
• Valuation Of Properties.
• Fixing Of Rents
Students
After School programs
Faculty
Years Established
Get In Touch
Location: 12-2-826/2/B, Flat No 201, 2nd Floor, Near Amba Theater, Kantinagar Colony, Mehdipatnam, Hyderabad,
Telangana State, India 500-028
Telephone: +9140 7961 2988 / +91 930 868 6868
Email: standardinstengg@gmail.com
Opening Hours: Mon-Sat: 10am – 4pm